Company LJS : 2015-2021 / Company AltiFroid : 2022 / Hotel LAPAGERIE : 2023
This diploma grants you the right to become a professional electrician. It covers a wide range of essential skills, including low voltage, interpretation of electrical diagrams, installation of electrical components, wiring, electrical maintenance, as well as strict compliance with safety standards.
This diploma deepens electrical skills, covering very low voltage (electronics), high voltage, programming of communicating devices (KNX, TX100, My Home), electrical energy management, and the rigorous application of safety standards.
This diploma provides training in essential skills related to the study and installation of fluid systems, including hydraulics, refrigeration, and ventilation. This also includes technologies such as heat pumps, solar panels, photovoltaics, and the Canadian well.
These diplomas are equivalent to the French diploma.
This diploma allows acquiring essential skills in the design and study of the thermal envelope of buildings, covering aspects such as thermal regulations, construction techniques, and thermal properties of materials. It also provides training in the study and integration of renewable energy sources necessary to meet the energy needs of buildings.
This 3-day training course allows you to acquire essential skills in the repair and maintenance of UNIC espresso machines (MIRA, AURA, EXPRESSO...), covering both electrical and mechanical troubleshooting.
Completed in 2018, this project involved the installation of the electrical system for the Saint-Sozy school, in France.
Carried out in 2017, the objective of this project was the renovation of the electrical system at the Belvédère in Rocamadour(France), covering both the restaurant area and the 17 rooms.
Completed in 2017, this project involved the installation of an electrical system in a renovated barn turned into a house, located along the road between Alvignac and Rocamadour (France).
More
Example of copper shaping and hydraulic safety installation on two Air/Water heat pumps.
Example of copper shaping and hydraulic safety installation on two Air/Water heat pumps.
Completion of a flushing of the underfloor heating system before commissioning the new DUO heat pump.
We can observe that the water present in the underfloor heating system exhibits very poor quality.
More
Execution of a gas leak detection in one of the positive cold room at Carrefour de Margencel (74200, France).
Leak identified at the high-pressure switch (HP).
We can observe that the thousand bubbles react at the high-pressure switch level after the nitrogen is introduced into the unit.
Second example of gas leak detection on a positive cold room. Here, you can observe the evaporator with its casing partially dismantled.
Leak identified at the solder joint between a capillary tube and the evaporator.
More
Example of a project completed in 2018: Installation of an Air/Water Heat Pump to replace an oil boiler. Here is the indoor unit before its insulation.
Example of a project completed in 2018: Installation of an Air/Water Heat Pump to replace an oil boiler. Here is the indoor unit before its insulation.
Example of a project completed in 2018: Here is the indoor unit with its insulation.
Example of a project completed in 2018: Here is the indoor unit with its insulation.
Example of a project completed in 2018: Positioning of the outdoor unit on a wall-mounted bracket.
Example of a project completed in 2018: Positioning of the outdoor unit on a wall-mounted bracket.
Example of a project completed in 2018: Positioning of the outdoor unit on a wall-mounted bracket.
More
Example of a project completed in 2020: Installation of an Air/Water DUO Heat Pump to replace an oil boiler. Here is the hydraulic installation before the placement of the indoor unit.
Example of a project completed in 2020:
Here is the installation with the indoor unit correctly positioned.
Example of a project completed in 2020:
Positioning of the outdoor unit on a wall-mounted bracket.
More
Example of a project completed in 2021: Installation of eight photovoltaic panels on a tiled roof in Miers (46500, France).
Example of a project completed in 2021:
Execution of the electrical wiring for the inverter, including its upstream and downstream protections.
Example of a project completed in 2021:
Installation of twelve photovoltaic panels on a tiled roof in Puybrun (46130, France).
Example of a project completed in 2021:
Installation of twelve photovoltaic panels on a tiled roof in Puybrun (46130).
Example of a project completed in 2021:
Installation of twelve photovoltaic panels on a tiled roof in Puybrun (46130).
More
Skill in troubleshooting and maintenance of traditional coffee machines from the brand Unic.
Here is an example of an infusion group that has not been regularly maintained. When setting up the percolator, water may leak everywhere, and the taste of the coffee will be greatly affected.
Here is an example of a showerhead completely blocked by old coffee that has become as hard as concrete.
The result is coffee with a significantly altered taste, which is due to insufficient maintenance.
More
Expertise in troubleshooting and maintenance of professional kitchen equipment.
Expertise in troubleshooting and maintenance of professional gas stoves (CHARVET, CDI, AMBASSADE).
Expertise in troubleshooting and maintenance of ovens, fryers, and crepe makers.
More
My name is Robin Tournie, and I have accumulated 9 years of experience in the construction sector.
I specialize primarily in the fields of electricity, refrigeration, and hydraulics.
My goal is to efficiently solve all your technical problems, leveraging my expertise and skills.
tournierobin@gmail.com